Vaptech

VAPTECH Has Signed Contracts For Projects in Bulgaria and Macedonia

HPP Lopushna is located in Bulgaria and HPP Kushnitsa is located in Macedonia.

HPP Lopushna will operate under a net head of 42,2 m and a maximum discharge of 1.5 m3/s. The flow is utilized by Francis turbine VAPHYDRO™. The rated turbine output is 550 kW. The scope of supply includes also supervision of installation and commissioning

HPP Kushnitsa will operate under a net head of 77,0 m and a maximum discharge of 0,44 m3/s. The flow is utilized by Pelton turbine VAPHYDRO™. The rated turbine output is 270 kW. The scope of supply includes also supervision of installation and commissioning