Vaptech

New Project – Sukhumi

VAPTECH has signed a contract for the supply of electromechanical equipment and associated services for HPP Sukhumi and this is one of the most challenging refurbishment and upgrade projects in the long history of VAPTECH

/uploads/news/90/thumbs/Sukhumi2_inline_inline.jpg

The scope of supply includes:

Turbine type is Francis with vertical shaft arrangement and maximum unit output of 7130 kW. These are high head Francis turbines at 215 meters net head and nominal speed of 750 rpm. The total installed capacity of the hydro power plant will be 21390 kW. The delivery time is 14 months.