Vaptech

VAPTECH delivered electromechanical equipment and services for HPP Çiğdem in Turkey

HPP Çiğdem is located in Turkey.

/uploads/project/25/thumbs/web4_inline.png /uploads/project/25/thumbs/Ref_Ensu_elektirik_inline.jpg

For this projcet VAPTECH has delivered: * 2 hydraulic turbines * 2 inlet valves and auxiliary equipment * 2 synchronous generators and auxiliary equipment * Supervisory Control and Data Acquisition System ( SCADA) * Supervision of installation works and commissioning.

/uploads/project/25/thumbs/front_cigdem_inline.png

HPP Çiğdem was put into operation in December 2013 and operates under a net head of 338,3 m and a maximum discharge of 3,00 m3/s. The flow is utilized by two identical Pelton turbines VAPHYDRO™ with 6 injectors and rated speed of 750 rpm. The rated turbine output is 9030 kW. The total installed capacity for the power plant is 18600 kW.

Later this year VAPTECH will deliver the electromechanical equipment for 4 more HPPs in Turkey. With these successfully executed projects VAPTECH confirms its significant presence on the hydropower market in Turkey.

/uploads/project/25/thumbs/4_inline.png /uploads/project/25/thumbs/web2_inline.png /uploads/project/25/thumbs/IMG_9626_inline.JPG

Calendar

2015
2014
2013
2012