{"id":596,"date":"2015-10-26T15:07:47","date_gmt":"2015-10-26T15:07:47","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/news\/vaptech-has-signed-contracts-for-projects-in-bulgaria-and-macedonia\/"},"modified":"2015-10-26T15:07:47","modified_gmt":"2015-10-26T15:07:47","slug":"vaptech-has-signed-contracts-for-projects-in-bulgaria-and-macedonia","status":"publish","type":"news","link":"https:\/\/vaptech.bg\/bg\/news\/vaptech-has-signed-contracts-for-projects-in-bulgaria-and-macedonia\/","title":{"rendered":"VAPTECH Has Signed Contracts For Projects in Bulgaria and Macedonia"},"content":{"rendered":"
HPP Lopushna will operate under a net head of 42,2 m and a maximum discharge of 1.5 m3\/s. The flow is utilized by Francis turbine VAPHYDRO\u2122. The rated turbine output is 550 kW. The scope of supply includes also supervision of installation and commissioning<\/p>\n\n\n
HPP Kushnitsa will operate under a net head of 77,0 m and a maximum discharge of 0,44 m3\/s. The flow is utilized by Pelton turbine VAPHYDRO\u2122. The rated turbine output is 270 kW. The scope of supply includes also supervision of installation and commissioning<\/p>","protected":false},"excerpt":{"rendered":"
# HPP Lopushna is located in Bulgaria and HPP Kushnitsa is located in Macedonia.<\/p>\n
HPP Lopushna will operate under a net head of 42,2 m and a maximum discharge of 1.5 m3\/s. The flow is utilized by Francis turbine VAPHYDRO\u2122. The rated turbine output is 550 kW. The scope of supply includes also supervision of installation and commissioning<\/p>\n
HPP Kushnitsa will operate under a net head of 77,0 m and a maximum discharge of 0,44 m3\/s. The flow is utilized by Pelton turbine VAPHYDRO\u2122. The rated turbine output is 270 kW. The scope of supply includes also supervision of installation and commissioning<\/p>","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"inline_featured_image":false},"class_list":["post-596","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"\n