{"id":1114,"date":"2020-08-20T19:58:00","date_gmt":"2020-08-20T19:58:00","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/?post_type=projects&p=1114"},"modified":"2025-08-07T20:03:53","modified_gmt":"2025-08-07T20:03:53","slug":"vaptech-installed-commissioned-a-hydropower-plant-with-4-horizontal-francis-turbines","status":"publish","type":"projects","link":"https:\/\/vaptech.bg\/bg\/projects\/vaptech-installed-commissioned-a-hydropower-plant-with-4-horizontal-francis-turbines\/","title":{"rendered":"VAPTECH \u0438\u043d\u0441\u0442\u0430\u043b\u0438\u0440\u0430 \u0438 \u043f\u0443\u0441\u043d\u0430 \u0432 \u0435\u043a\u0441\u043f\u043b\u043e\u0430\u0442\u0430\u0446\u0438\u044f \u0432\u043e\u0434\u043d\u043e\u0435\u043b\u0435\u043a\u0442\u0440\u0438\u0447\u0435\u0441\u043a\u0430 \u0446\u0435\u043d\u0442\u0440\u0430\u043b\u0430 \u0441 4 \u0445\u043e\u0440\u0438\u0437\u043e\u043d\u0442\u0430\u043b\u043d\u0438 \u0424\u0440\u0430\u043d\u0446\u0438\u0441\u043e\u0432\u0438 \u0442\u0443\u0440\u0431\u0438\u043d\u0438"},"content":{"rendered":"

Located in Southeast Europe, this Hydropower plant consist of four Francis turbines with a horizontal shaft arrangement at a rated speed of 500 rpm. The power plant is operating under a rated net head of 45 m and a total discharge of 8.75m3\/s. VAPTECH has designed, developed and manufactured all hydromechanical equipment for the greenfield Hydropower project.<\/p>\n\n\n\n

Even during the times of COVID-19, VAPTECH\u2019s Team continues to install, commission and provide full assistance to meet our clients needs and project deadlines.<\/p>\n\n\n