{"id":1121,"date":"2019-06-20T20:06:00","date_gmt":"2019-06-20T20:06:00","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/?post_type=projects&p=1121"},"modified":"2025-08-07T20:08:23","modified_gmt":"2025-08-07T20:08:23","slug":"vaptech-fully-installed-commissioned-a-hydropower-cascade-with-a-collective-output-of-13-4-mw","status":"publish","type":"projects","link":"https:\/\/vaptech.bg\/bg\/projects\/vaptech-fully-installed-commissioned-a-hydropower-cascade-with-a-collective-output-of-13-4-mw\/","title":{"rendered":"VAPTECH \u043d\u0430\u043f\u044a\u043b\u043d\u043e \u0438\u043d\u0441\u0442\u0430\u043b\u0438\u0440\u0430 \u0438 \u043f\u0443\u0441\u043d\u0430 \u0432 \u0435\u043a\u0441\u043f\u043b\u043e\u0430\u0442\u0430\u0446\u0438\u044f \u0432\u043e\u0434\u043d\u043e\u0435\u043b\u0435\u043a\u0442\u0440\u0438\u0447\u0435\u0441\u043a\u0430 \u043a\u0430\u0441\u043a\u0430\u0434\u0430 \u0441 \u043e\u0431\u0449\u0430 \u043c\u043e\u0449\u043d\u043e\u0441\u0442 13,4 MW"},"content":{"rendered":"
VAPTECH fully installed and commissioned a Hydropower cascade with a collective output of 13.4 MW for the Caucasus region. The cascade consists of two Hydropower plants one of which consists of 2 vertical pelton turbines with a head of 433,5m and a total output of 8144 kW. The second power plant consists of two vertical Pelton turbines with a head of 213m and a total output of 5236 kW. All electromechanical equipment has been manufactured by VAPTECH according to the full satisfaction of the client.<\/p>\n\n\n\n
Even during COVID-19 and seasonal holidays, VAPTECH’s team continued to carry out the commissioning and instalation of the contracted equipment, providing full assistance and meeting all deadlines.<\/p>\n\n\n