{"id":1128,"date":"2018-08-02T20:11:00","date_gmt":"2018-08-02T20:11:00","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/?post_type=projects&p=1128"},"modified":"2025-08-07T20:12:58","modified_gmt":"2025-08-07T20:12:58","slug":"greenfield-project-based-on-vertical-francis-solution-in-bosnia-and-herzegovina","status":"publish","type":"projects","link":"https:\/\/vaptech.bg\/bg\/projects\/greenfield-project-based-on-vertical-francis-solution-in-bosnia-and-herzegovina\/","title":{"rendered":"\u041f\u0420\u041e\u0415\u041a\u0422 \"\u041d\u0410 \u0417\u0415\u041b\u0415\u041d\u041e\", \u0411\u0410\u0417\u0418\u0420\u0410\u041d \u041d\u0410 \u0412\u0415\u0420\u0422\u0418\u041a\u0410\u041b\u041d\u041e \u0420\u0415\u0428\u0415\u041d\u0418\u0415 FRANCIS \u0412 \u0411\u041e\u0421\u041d\u0410 \u0418 \u0425\u0415\u0420\u0426\u0415\u0413\u041e\u0412\u0418\u041d\u0410"},"content":{"rendered":"
\u0422\u0438\u043f \u043d\u0430 \u0442\u0443\u0440\u0431\u0438\u043d\u0430\u0442\u0430:<\/td>Vertical \u0424\u0440\u0430\u043d\u0441\u0438\u0441<\/a><\/td><\/tr>
\u041e\u0431\u0449\u0430 \u0438\u043d\u0441\u0442\u0430\u043b\u0438\u0440\u0430\u043d\u0430 \u043c\u043e\u0449\u043d\u043e\u0441\u0442 [kW]:<\/td>5214<\/td><\/tr>
\u0411\u0440\u043e\u0439 \u0435\u0434\u0438\u043d\u0438\u0446\u0438:<\/td>3<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n

The guaranteed measurements during the operation showed an excellent performance and maximum turbine efficiency of 93,7%. Choosing to make energy from this hydropower project instead of using fossil fuels has a significantly reduce the annual potential CO2 production by over 2600kg of CO2.<\/p>\n\n\n