Wasserkraft

18 MW GREENFIELD HYDROPOWER PLANT

Ort:
Türkei
Datum:
19-10-2018

Beschreibung

Turbine Type: Vertical Pelton
Total Installed Power [kW]: 18600
Number of Units: 2

VAPTECH has delivered full electromechanical equipment and services. By choosing to make energy from this hydropower solution instead of fossil fuels, the potential annual CO2 production has been reduced by more than 9400 kg.

Turkey remains one of Europe’s leading markets for potential hydropower development due to abundant water resources. 

It is a privilege that more than 900 MW hydropower equipment produced by VAPTECH has been installed in the country over the last 20 years. 

Weitere Projekte

Mechanische Doppelständer-Presse PE500D​
Metallumformung
2019
arrow_right_alt arrow_right_alt
Mechanische Doppelständer-Presse PE315D​
Metallumformung
2019
arrow_right_alt arrow_right_alt
Mechanical press machine PE250D
Metallumformung
2019
arrow_right_alt arrow_right_alt