Located in Southeast Europe, this Hydropower plant consist of four Francis turbines with a horizontal shaft arrangement at a rated speed of 500 rpm. The power plant is operating under a rated net head of 45 m and a total discharge of 8.75m3/s. VAPTECH has designed, developed and manufactured all hydromechanical equipment for the greenfield Hydropower project.

Even during the times of COVID-19, VAPTECH’s Team continues to install, commission and provide full assistance to meet our clients needs and project deadlines.