VAPTECH is pleased to present this project in the Western Balkan for which VAPTECH delivered complete electromechanical equipment.
The hydropower plant is operating under a net head of 40 m and a maximum discharge of 3 m3/s. The flow is utilized by two VAPTECH horizontal Francis turbines at a rated speed of 750 rpm. The total installed capacity of the power plant is 2164 kW.
The scope of supply further includes two sets of butterfly valves DN900 PN 16 designed and manufactured by VAPTECH, high pressure units, inlet cones, dismantling joints, synchronous generators with digital excitation system, a PLC based automation system with SCADA, 35 kV middle voltage electrical equipment. VAPTECH provided transportation of the equipment to the site, installation and commissioning.