Wasserkraft

VAPTECH's Recent Hydropower Plant in Southeast Europe

Datum:
29-10-2021

Beschreibung

VAPTECH recently installed & commissioned a new Hydropower plant in Southeast Europe

This outstanding HPP is in operation and already producing clean energy. The project is based on two Vertical Pelton Turbines with a total output of 6,550 kW (manufactured at VAPTECH' works).
As usual, VAPTECH acted as a true partner on the side of the client in providing the best return on investment solution.

Weitere Projekte

Mechanische Doppelständer-Presse PE500D​
Metallumformung
2019
arrow_right_alt arrow_right_alt
Mechanische Doppelständer-Presse PE315D​
Metallumformung
2019
arrow_right_alt arrow_right_alt
Mechanical press machine PE250D
Metallumformung
2019
arrow_right_alt arrow_right_alt