{"id":565,"date":"2015-10-20T16:00:12","date_gmt":"2015-10-20T16:00:12","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/news\/vaptech-has-successfully-commissioned-mesici-nova-hydropower-plant-in-bosnia-and-herzegovina\/"},"modified":"2015-10-20T16:00:12","modified_gmt":"2015-10-20T16:00:12","slug":"vaptech-has-successfully-commissioned-mesici-nova-hydropower-plant-in-bosnia-and-herzegovina","status":"publish","type":"news","link":"https:\/\/vaptech.bg\/de\/news\/vaptech-has-successfully-commissioned-mesici-nova-hydropower-plant-in-bosnia-and-herzegovina\/","title":{"rendered":"VAPTECH Has Successfully Commissioned Mesici-Nova Hydropower Plant in Bosnia and Herzegovina"},"content":{"rendered":"
#On May 30, 2015 Mesici-Nova hydropower plant was put into operation<\/p>\n\n\n
!m<\/a><\/p>\n\n\n Mesici-Nova is located in the municipality of Rogatica in Bosnia and Herzegovina. The owner of the plant is ZP Elektrodistribucija ad Pale<\/a>. The installed capacity of HPP Mesic Nova is 5214 kW and it has three turbine-generator sets, each with capacity 1738 kW. <\/p>\n\n\n For this project VAPTECH delivered 3 identical vertical Francis turbines and 3 butterfly valves DN1100, PN10. Each of the turbines has capacity of 1738 kW and works in estimated net head of 48,26 meters, flow 4 m3\/s and rated speed 600 rpm. The maximum efficiency of the turbines is 93,7%.<\/p>\n\n\n The performed guarantees measurements during the operation showed excellent values in terms of efficiency, noise and vibration.<\/p>\n\n !m<\/a>\n!m<\/a>\n!m<\/a><\/p>\n \u25ca\u25ca\u25ca<\/p>\n\n\n\n