{"id":594,"date":"2015-10-26T14:21:18","date_gmt":"2015-10-26T14:21:18","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/news\/vaptech-delivered-electromechanical-equipment-for-ravna-hpp-in-bulgaria\/"},"modified":"2015-10-26T14:21:18","modified_gmt":"2015-10-26T14:21:18","slug":"vaptech-delivered-electromechanical-equipment-for-ravna-hpp-in-bulgaria","status":"publish","type":"news","link":"https:\/\/vaptech.bg\/de\/news\/vaptech-delivered-electromechanical-equipment-for-ravna-hpp-in-bulgaria\/","title":{"rendered":"VAPTECH Delivered Electromechanical Equipment For Ravna HPP in Bulgaria"},"content":{"rendered":"
Ravna HPP has been put into operation on 22th of January 2014. The plant operates under a net head of 400,0 m and a maximum discharge of 0.33 m3\/s. The flow is utilized by Pelton turbine VAPHYDRO\u2122 with 2 injectors and rated speed of 1000 rpm. The rated turbine output is 1170 kW. <\/p>\n\n\n
!m<\/a><\/p>\n\n\n In the scope of supply for HPP Ravna VAPTECH provided: <\/p>\n\n \u2022 Pelton turbine with horizontal shaft arrangement \n\u2022 Synchronous hydro generator \n\u2022 Automation system \n\u2022 Supervision of installation works and commissioning<\/p>\n \u25ca\u25ca\u25ca<\/p>\n\n\n