{"id":598,"date":"2015-10-26T15:13:55","date_gmt":"2015-10-26T15:13:55","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/news\/vaptech-delivered-elecromechanical-equipment-and-services-for-two-hydropower-plants-in-albania\/"},"modified":"2015-10-26T15:13:55","modified_gmt":"2015-10-26T15:13:55","slug":"vaptech-delivered-elecromechanical-equipment-and-services-for-two-hydropower-plants-in-albania","status":"publish","type":"news","link":"https:\/\/vaptech.bg\/de\/news\/vaptech-delivered-elecromechanical-equipment-and-services-for-two-hydropower-plants-in-albania\/","title":{"rendered":"VAPTECH Delivered Elecromechanical Equipment and Services For Two Hydropower Plants in Albania."},"content":{"rendered":"
#The projects are located in Albania<\/p>\n\n\n
HPP Truen has been put into operation on October 18th. The plant operates under a net head of 551.5 m and a maximum discharge of 0.5 m3\/s. The flow is utilized by Pelton turbine VAPHYDRO\u2122 with 2 injectors and rated speed of 1000 rpm. The rated turbine output is 2470 kW.<\/p>\n\n
In the scope of delivery for HPP Truen VAPTECH provided:\n\u2022 Pelton turbine with horizontal shaft arrangement\n\u2022 Synchronous hydro generator\n\u2022 Spherical valve DN300 PN70\n\u2022 Oil Governing system (HPU)\n\u2022 PLC based automation system \n\u2022 Additional connection pipe\n\u2022 Supervision of installation <\/p>\n\n
For HPP Dardha 1, VAPTECH has provided diagnosis on the hydropower plant and services for alignment of the turbine-generator shaft line and adjustment for improvement of the plant performance.<\/p>","protected":false},"excerpt":{"rendered":"
#The projects are located in Albania<\/p>\n
HPP Truen has been put into operation on October 18th. The plant operates under a net head of 551.5 m and a maximum discharge of 0.5 m3\/s. The flow is utilized by Pelton turbine VAPHYDRO\u2122 with 2 injectors and rated speed of 1000 rpm. The rated turbine output is 2470 kW.<\/p>\n
In the scope of delivery for HPP Truen VAPTECH provided:
\n\u2022 Pelton turbine with horizontal shaft arrangement
\n\u2022 Synchronous hydro generator
\n\u2022 Spherical valve DN300 PN70
\n\u2022 Oil Governing system (HPU)
\n\u2022 PLC based automation system
\n\u2022 Additional connection pipe
\n\u2022 Supervision of installation <\/p>\n
For HPP Dardha 1, VAPTECH has provided diagnosis on the hydropower plant and services for alignment of the turbine-generator shaft line and adjustment for improvement of the plant performance.<\/p>","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"inline_featured_image":false},"class_list":["post-598","news","type-news","status-publish","hentry"],"acf":[],"yoast_head":"\n