{"id":645,"date":"2016-08-26T10:01:47","date_gmt":"2016-08-26T10:01:47","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/news\/vaptech-has-successfully-commissioned-hydropower-plant-candir-i-in-turkey\/"},"modified":"2016-08-26T10:01:47","modified_gmt":"2016-08-26T10:01:47","slug":"vaptech-has-successfully-commissioned-hydropower-plant-candir-i-in-turkey","status":"publish","type":"news","link":"https:\/\/vaptech.bg\/de\/news\/vaptech-has-successfully-commissioned-hydropower-plant-candir-i-in-turkey\/","title":{"rendered":"VAPTECH Has Successfully Commissioned Hydropower Plant Candir-I in Turkey"},"content":{"rendered":"
Candir-I hydro power plant has an installed capacity of 1,8 MW. VAPTECH delivered an electromechanical system based on two identical Francis turbines with horizontal shaft arrangement that operate under a net head of 122,6 m and a flow of 0,85 m3\/s per unit. The turbines rated output is 0,896 MW at a rotation speed of 1500 rpm. <\/p>\n\n\n
VAPTECH delivered also main inlet butterfly valves, bypass systems, generators, hydraulic unit, plant automation, supervision of installation works and commissioning.<\/p>\n\n\n