{"id":1118,"date":"2020-04-16T20:04:00","date_gmt":"2020-04-16T20:04:00","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/?post_type=projects&p=1118"},"modified":"2025-08-07T20:49:26","modified_gmt":"2025-08-07T20:49:26","slug":"vaptech-remotely-commissioned-a-hydropower-plant-in-southern-europe","status":"publish","type":"projects","link":"https:\/\/vaptech.bg\/de\/projects\/vaptech-remotely-commissioned-a-hydropower-plant-in-southern-europe\/","title":{"rendered":"VAPTECH nahm ein Wasserkraftwerk in S\u00fcdeuropa aus der Ferne in Betrieb"},"content":{"rendered":"

Even in the times of COVID-19, VAPTECH successfully managed to remotely commission a 2.5 MW hydropower plant in Southern Europe, while strictly abiding to all internationally accepted safety standards. To VAPTECH\u2019s knowledge, It is the first time in the world that a team of high level commissioning engineers were able to remotely commission a hydropower plant. VAPTECH\u2019s digital integrated communication system proved its capabilities, as thanks to its vast functionalities, VAPTECH\u2019s team was able realize this project. Situations like this have shown VAPTECH that we are ever more flexible and consistently pushing our creative thinking skills in order to make one more customer satisfied even in times of a global pandemic.<\/p>\n\n\n\n

During COVID-19, VAPTECH\u2019s factory remains fully operational with strict guidelines to assure the health and safety of our colleagues. In these difficult times, we are constantly striving for excellence and innovation for our clients\u2019 interest is VAPTECH\u2019s interest.<\/p>\n\n\n