{"id":1124,"date":"2018-09-13T20:08:00","date_gmt":"2018-09-13T20:08:00","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/?post_type=projects&p=1124"},"modified":"2025-08-07T20:11:03","modified_gmt":"2025-08-07T20:11:03","slug":"vaptech-installed-commissioned-a-21-mw-hydropower-plant-with-3-horizontal-francis-turbines","status":"publish","type":"projects","link":"https:\/\/vaptech.bg\/de\/projects\/vaptech-installed-commissioned-a-21-mw-hydropower-plant-with-3-horizontal-francis-turbines\/","title":{"rendered":"VAPTECH installierte und nahm ein 21-MW-Wasserkraftwerk mit 3 horizontalen Francisturbinen in Betrieb"},"content":{"rendered":"

Located in Southeast Europe, this Hydropower plant consist of 3 Francis turbines with a horizontal shaft arrangement at a rated speed of 750 rpm. The power plant is operating under a rated net head of 185 m. Two of the turbines each have an output of 8540 MW and a total discharge of 5.05m3\/s while the third turbine has an output of 3720 MW and a total discharge of 2,2m3\/s. VAPTECH has designed, developed and manufactured all hydromechanical equipment for the greenfield Hydropower project.<\/p>\n\n\n