Hidroelectricidad

TOSHIBA & VAPTECH, hydropower project Chaira

Fecha:
15-02-2017

Descripción

Started in 1982, Project Chaira is a pumped storage hydropower plant. Project Chaira has a total capacity of 864 megawatts and a pumping capacity of 788 megawatts. The Chaira project consists of four reversible Francis pump-turbines, each producing at 216 megawatts in the generating mode, and 197 megawatts in pumping mode. At that time Chaira held the record for being the largest pumped-storage hydropower plant in southeast Europe. The project has a head of 690 meters generating and 701 meters pumping, which at the timewas the record head of a single-stage pumpe trubine.

Otros proyectos

Prensa excéntrica mecánica PE500D
DEFORMACIÓN DE METALES
2019
arrow_right_alt arrow_right_alt
Prensa excéntrica mecánica PE315D
DEFORMACIÓN DE METALES
2019
arrow_right_alt arrow_right_alt
Mechanical press machine PE250D
DEFORMACIÓN DE METALES
2019
arrow_right_alt arrow_right_alt
Centro de descargas Ver y descargar archivos.
Descargar archivo