{"id":574,"date":"2015-10-20T16:45:40","date_gmt":"2015-10-20T16:45:40","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/news\/hydropower-plant-lenishta-in-bulgaria-is-completed\/"},"modified":"2015-10-20T16:45:40","modified_gmt":"2015-10-20T16:45:40","slug":"hydropower-plant-lenishta-in-bulgaria-is-completed","status":"publish","type":"news","link":"https:\/\/vaptech.bg\/es\/news\/hydropower-plant-lenishta-in-bulgaria-is-completed\/","title":{"rendered":"Hydropower Plant Lenishta in Bulgaria is Completed"},"content":{"rendered":"
!m<\/a>\n!m<\/a><\/p>\n Lenishta operates under a net head of 59,50 m and a maximum discharge of 1,1 m3\/s. The flow is utilized by one Horizontal Francis turbine VAPHYDRO\u2122 at a rated speed of 1000 rpm. The rated turbine output is 570 kW. \nFor this project VAPTECH has delivered aslo butterfly valve DN 600 PN 10 bar, automation, supervision and installation.<\/p>\n\n \u25ca\u25ca\u25ca<\/p>\n\n