{"id":1147,"date":"2018-03-14T20:24:00","date_gmt":"2018-03-14T20:24:00","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/?post_type=projects&p=1147"},"modified":"2025-08-07T20:26:09","modified_gmt":"2025-08-07T20:26:09","slug":"6650-kw-greenfield-high-head-project-in-turkey","status":"publish","type":"projects","link":"https:\/\/vaptech.bg\/es\/projects\/6650-kw-greenfield-high-head-project-in-turkey\/","title":{"rendered":"6650 kW GREENFIELD HIGH HEAD PROJECT IN TURKEY"},"content":{"rendered":"
Tipo de turbina:<\/td>Horizontal Pelton<\/td><\/tr>
Potencia total instalada [kW]:<\/td>6650<\/td><\/tr>
N\u00famero de unidades: <\/td>1<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n

For this project VAPTECH has delivered full electromechanical equipment.<\/p>\n\n\n\n

The solution provides a full operational flow. The clients choice to generate energy from this Hydropower Plant instead of fossil fuels achieved a reduction in potential CO2 output of more than 3300 kg CO2.<\/p>\n\n\n