{"id":1171,"date":"2019-07-24T20:33:00","date_gmt":"2019-07-24T20:33:00","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/?post_type=projects&p=1171"},"modified":"2025-08-07T20:39:45","modified_gmt":"2025-08-07T20:39:45","slug":"modernization-of-hydropower-cascade-in-romania","status":"publish","type":"projects","link":"https:\/\/vaptech.bg\/es\/projects\/modernization-of-hydropower-cascade-in-romania\/","title":{"rendered":"MODERNIZACION DE LA CASCADA HIDROELECTRICA EN RUMANIA"},"content":{"rendered":"
Tipo de turbina:<\/td>Francis horizontal<\/td><\/tr>
Potencia total instalada [kW]:<\/td>1500<\/td><\/tr>
N\u00famero de unidades:<\/td>3<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n

The Cascade consists of three hydropower plants located in Romania. For this project VAPTECH has executed rehabilitation of the three existing units with design, production and delivery of new electromechanical equipment. <\/p>\n\n\n