{"id":1197,"date":"2014-08-07T20:45:00","date_gmt":"2014-08-07T20:45:00","guid":{"rendered":"https:\/\/vaptech.blueberry.bg\/?post_type=projects&p=1197"},"modified":"2025-08-07T20:47:47","modified_gmt":"2025-08-07T20:47:47","slug":"toshiba-vaptech-hydropower-project-chaira","status":"publish","type":"projects","link":"https:\/\/vaptech.bg\/es\/projects\/toshiba-vaptech-hydropower-project-chaira\/","title":{"rendered":"TOSHIBA & VAPTECH, proyecto hidroel\u00e9ctrico Chaira"},"content":{"rendered":"
Started in 1982, Project Chaira is a pumped storage hydropower plant. Project Chaira has a total capacity of 864 megawatts and a pumping capacity of 788 megawatts. The Chaira project consists of four reversible Francis pump-turbines, each producing at 216 megawatts in the generating mode, and 197 megawatts in pumping mode. At that time Chaira held the record for being the largest pumped-storage hydropower plant in southeast Europe. The project has a head of 690 meters generating and 701 meters pumping, which at the time was the record head of a single-stage pump turbine.<\/p>\n\n\n\n