#VAPTECH has signed a new contract in Albania for SHPP Vertop !m
The scope of supply includes 2 sets of turbines, generators, plant automation system, 36 kV middle voltage electrical system, site supervision of installation and launch into operation. Turbines type is “Pelton” with vertical shaft arrangement with six injectors and rated speed of 600 rpm. Rated output is 840 kW per unit. The delivery time is 8 months.
This is the ffifth contract of VAPTECH for Albania which validates the leading position of the company in South-East Europe. You can visit the project with our first already commissioned and working power plant in Albania – SHPP Rrypa.