VAPTECH Installed & Commissioned a Hydropower Plant With 4 Horizontal Francis Turbines
Hidroelectricidad
2020
arrow_right_alt arrow_right_alt
VAPTECH Remotely Commissioned a Hydropower Plant in Southern Europe
Hidroelectricidad
2020
arrow_right_alt arrow_right_alt
VAPTECH Fully Installed & Commissioned a Hydropower Cascade With a Collective Output of 13.4 MW
Hidroelectricidad
2019
arrow_right_alt arrow_right_alt
VAPTECH Installed & Commissioned a 21 MW Hydropower Plant With 3 Horizontal Francis Turbines
Hidroelectricidad
2018
arrow_right_alt arrow_right_alt
GREENFIELD PROJECT BASED ON VERTICAL FRANCIS SOLUTION IN BOSNIA AND HERZEGOVINA
Hidroelectricidad
2018
arrow_right_alt arrow_right_alt
18 MW GREENFIELD HYDROPOWER PLANT
Hidroelectricidad
2018
arrow_right_alt arrow_right_alt
MODERNIZATION PROJECT IN SOUTH AMERICA
Hidroelectricidad
2018
arrow_right_alt arrow_right_alt
REFURBISHMENT PROJECT IN VIETNAM
Hidroelectricidad
2018
arrow_right_alt arrow_right_alt
21,540 kW COMPLETE REFURBISHMENT PROJECT
Hidroelectricidad
2018
arrow_right_alt arrow_right_alt
6650 kW GREENFIELD HIGH HEAD PROJECT IN TURKEY
Hidroelectricidad
2018
arrow_right_alt arrow_right_alt
GREENFIELD PROJECT BASED ON VERTICAL PELTON TURBINE, GEORGIA
Hidroelectricidad
2016
arrow_right_alt arrow_right_alt
1109 kW GREENFIELD PROJECT IN TURKEY
Hidroelectricidad
2018
arrow_right_alt arrow_right_alt
Centro de descargas Ver y descargar archivos.
Descargar archivo