6650 kW GREENFIELD HIGH HEAD PROJECT IN TURKEY

6650 kW GREENFIELD HIGH HEAD PROJECT IN TURKEY
March 14, 2018
Turbine Type:Horizontal Pelton
Total Installed Power [kW]:6650
Number of Units: 1

For this project VAPTECH has delivered full electromechanical equipment.

The solution provides a full operational flow. The clients choice to generate energy from this Hydropower Plant instead of fossil fuels achieved a reduction in potential CO2 output of more than 3300 kg CO2.