Prensa excéntrica mecánica PE500D
DEFORMACIÓN DE METALES
2019
arrow_right_alt
arrow_right_alt
VAPTECH remotely commissioned a Hydropower Project in Asia.
The Hydropower solution is based on a high speed compact Horizontal Francis Turbine (manufactured at VAPTECH' works). The Power plant has a head of 40m and a total output of 570 kW.
Even during COVID-19, VAPTECH's team continued to carry out the commissioning and instalation of the contracted equipment, providing full assistance and meeting all deadlines.