#On May 30, 2015 Mesici-Nova hydropower plant was put into operation
Mesici-Nova is located in the municipality of Rogatica in Bosnia and Herzegovina. The owner of the plant is ZP Elektrodistribucija ad Pale. The installed capacity of HPP Mesic Nova is 5214 kW and it has three turbine-generator sets, each with capacity 1738 kW.
For this project VAPTECH delivered 3 identical vertical Francis turbines and 3 butterfly valves DN1100, PN10. Each of the turbines has capacity of 1738 kW and works in estimated net head of 48,26 meters, flow 4 m3/s and rated speed 600 rpm. The maximum efficiency of the turbines is 93,7%.
The performed guarantees measurements during the operation showed excellent values in terms of efficiency, noise and vibration.
◊◊◊
VAPTECH es un proveedor mundial de equipos y servicios para las industrias hidroeléctrica y de conformado de metales. Fundada en 1914, VAPTECH tiene su sede en Sofía, Bulgaria, así como su planta de producción en Pleven, Bulgaria, ubicada en más de 40.000 metros cuadrados.
HIDRO división de VAPTECH
VAPTECH suministra equipos electromecánicos completos para centrales hidroeléctricas, centrándose principalmente en turbinas que constan de: válvulas, compuertas y sistemas de automatización altamente eficientes. VAPTECH cuenta con más de 80 años de experiencia en la producción de turbinas pequeñas, medianas y grandes, con una entrega de más de 8.000 MW de equipos instalados. Todo el equipo mecánico de VAPTECH es fabricado y probado en las instalaciones de producción de VAPTECH.