The project name is Satului and it is located in Romania.
The scope of supply includes full electromechanical equipment (turnkey) delivery, based on Pelton turbine VAPHYDRO™ , generator, plant automation system, 20 kV middle voltage electrical system, site supervision of installation and launch into operation.
Satului HPP will operate under a net head of 238,3 m and a maximum discharge of 0,51 m3/s. The flow will be utilized by Pelton turbine VAPHYDRO™ and rated speed of 750 rpm. The rated turbine output is 1068 kW.
The delivery time for the equipment is 7 months.
This is the fifth contract of VAPTECH for Romania for this year which validates the leading position of the company in South-East Europe