VAPTECH Installed & Commissioned a Hydropower Plant in Southeast Europe!
Hydropower
2021
arrow_right_alt arrow_right_alt
VAPTECH Remotely Commissioned a Hydropower Project in Asia!
Hydropower
2021
arrow_right_alt arrow_right_alt
VAPTECH Recently Commissioned a Horizontal Francis Solution in Southeastern Europe!
Hydropower
2021
arrow_right_alt arrow_right_alt
VAPTECH Delivers & Installs a 8560 kW Hydropower Cascade for the Balkans
Hydropower
2020
arrow_right_alt arrow_right_alt
VAPTECH Delivers & Installs a 7406 kW Vertical and Horizontal Pelton Solution in the Balkans
Hydropower
2020
arrow_right_alt arrow_right_alt
VAPTECH Installed & Commissioned a Hydropower Plant With 4 Horizontal Francis Turbines
Hydropower
2020
arrow_right_alt arrow_right_alt
VAPTECH Remotely Commissioned a Hydropower Plant in Southern Europe
Hydropower
2020
arrow_right_alt arrow_right_alt
VAPTECH Fully Installed & Commissioned a Hydropower Cascade With a Collective Output of 13.4 MW
Hydropower
2019
arrow_right_alt arrow_right_alt
VAPTECH Installed & Commissioned a 21 MW Hydropower Plant With 3 Horizontal Francis Turbines
Hydropower
2018
arrow_right_alt arrow_right_alt
GREENFIELD PROJECT BASED ON VERTICAL FRANCIS SOLUTION IN BOSNIA AND HERZEGOVINA
Hydropower
2018
arrow_right_alt arrow_right_alt
18 MW GREENFIELD HYDROPOWER PLANT
Hydropower
2018
arrow_right_alt arrow_right_alt
MODERNIZATION PROJECT IN SOUTH AMERICA
Hydropower
2018
arrow_right_alt arrow_right_alt