Hydropower

COMPACT HYDROPOWER SOLUTION IN ARMENIA

Location:
Armenia
Date:
09-02-2017

Description

Turbine Type: Francis
Total Installed Power [kW]: 1172
Number of Units:  1

Seca hydropower plant was successfully put into operation in November 2016 in Armenia. For this project VAPTECH delivered high rated speed horizontal Francis turbine at 1000 rpm, butterfly valve, generator, protection system, power transformer, transformer protection device, PLC automation system. 