Hydropower

6650 kW GREENFIELD HIGH HEAD PROJECT IN TURKEY

Location:
Turkey
Date:
14-03-2018

Description

Turbine Type: Horizontal Pelton
Total Installed Power [kW]: 6650
Number of Units:  1

For this project VAPTECH has delivered full electromechanical equipment.

The solution provides a full operational flow. The clients choice to generate energy from this Hydropower Plant instead of fossil fuels achieved a reduction in potential CO2 output of more than 3300 kg CO2.