VAPTECH to Supply Full Electromechanical Equipment For 1725 kW HPP in Albania

VAPTECH to Supply Full Electromechanical Equipment For 1725 kW HPP in Albania

VAPTECH was awarded with the delivery of full electromechanical equipment for the hydropower project located in Albania

The HPP will be supplied with full electromechanical equipment developed and integrated by VAPTECH.

The plant will give a total output of 1725 kW and will utilize a head of 455,4 m.

VAPTECH is strongly involved in the hydropower sector of Albania. To date, VAPTECH has a total of 41,381 kW of installed power in Albania. 

More News