Hydropower

1109 kW GREENFIELD PROJECT IN TURKEY

Location:
Turkey
Date:
19-10-2018

Description

Turbine Type: Vertical Pelton
Number of units: 1
Total Installed Power [kW] 1109

For this project VAPTECH has delivered full electromechanical equipment and services.

The solution is based on compact integrated system for maximum convenience of the civil side for the project. 

Other projects

Mechanical press machine PE500D
Metal Forming
2019
arrow_right_alt arrow_right_alt
Mechanical press machine PE315D
Metal Forming
2019
arrow_right_alt arrow_right_alt
Mechanical press machine PE250D
Metal Forming
2019
arrow_right_alt arrow_right_alt