VAPTECH Installed & Commissioned a Hydropower Plant With 4 Horizontal Francis Turbines
Hydropower
2020
arrow_right_alt arrow_right_alt
VAPTECH Remotely Commissioned a Hydropower Plant in Southern Europe
Hydropower
2020
arrow_right_alt arrow_right_alt
VAPTECH Fully Installed & Commissioned a Hydropower Cascade With a Collective Output of 13.4 MW
Hydropower
2019
arrow_right_alt arrow_right_alt
VAPTECH Installed & Commissioned a 21 MW Hydropower Plant With 3 Horizontal Francis Turbines
Hydropower
2018
arrow_right_alt arrow_right_alt
GREENFIELD PROJECT BASED ON VERTICAL FRANCIS SOLUTION IN BOSNIA AND HERZEGOVINA
Hydropower
2018
arrow_right_alt arrow_right_alt
18 MW GREENFIELD HYDROPOWER PLANT
Hydropower
2018
arrow_right_alt arrow_right_alt
MODERNIZATION PROJECT IN SOUTH AMERICA
Hydropower
2018
arrow_right_alt arrow_right_alt
REFURBISHMENT PROJECT IN VIETNAM
Hydropower
2018
arrow_right_alt arrow_right_alt
21,540 kW COMPLETE REFURBISHMENT PROJECT
Hydropower
2018
arrow_right_alt arrow_right_alt
6650 kW GREENFIELD HIGH HEAD PROJECT IN TURKEY
Hydropower
2018
arrow_right_alt arrow_right_alt
GREENFIELD PROJECT BASED ON VERTICAL PELTON TURBINE, GEORGIA
Hydropower
2016
arrow_right_alt arrow_right_alt
1109 kW GREENFIELD PROJECT IN TURKEY
Hydropower
2018
arrow_right_alt arrow_right_alt