Mеханична ексцентър преса PE500D
Пресово Оборудване
2019
arrow_right_alt
arrow_right_alt
Turbine Type: | Francis |
Total Installed Power [kW]: | 1172 |
Number of Units: | 1 |
Seca hydropower plant was successfully put into operation in November 2016 in Armenia. For this project VAPTECH delivered high rated speed horizontal Francis turbine at 1000 rpm, butterfly valve, generator, protection system, power transformer, transformer protection device, PLC automation system.