Хидроенергетика

TOSHIBA & VAPTECH, hydropower project Chaira

Date:
15-02-2017

За Проекта

Started in 1982, Project Chaira is a pumped storage hydropower plant. Project Chaira has a total capacity of 864 megawatts and a pumping capacity of 788 megawatts. The Chaira project consists of four reversible Francis pump-turbines, each producing at 216 megawatts in the generating mode, and 197 megawatts in pumping mode. At that time Chaira held the record for being the largest pumped-storage hydropower plant in southeast Europe. The project has a head of 690 meters generating and 701 meters pumping, which at the timewas the record head of a single-stage pumpe trubine.  

Още Проекти

Mеханична ексцентър преса PE500D
Пресово Оборудване
2019
arrow_right_alt arrow_right_alt
Mеханична ексцентър преса PE315D
Пресово Оборудване
2019
arrow_right_alt arrow_right_alt
Mеханична ексцентър преса PE250D
Пресово Оборудване
2019
arrow_right_alt arrow_right_alt